Between 1955 and 1959 a concrete wall 128 m high was built across the Zambezi River at Kariba Gorge, on the border of today's Zambia and Zimbabwe. The lake behind it is one of the largest reservoirs in the world, about 280 km long. Why was this gorge chosen, why in the 1950s, and who paid? Answering those three questions is the method of this lesson: every power station is the result of physical, economic, political and social factors acting together (Figure 1).
Figure 1: The four groups of factors that decide where power is produced.
Definition
Factor of production (energy): any condition that makes it possible or worthwhile to produce energy in a place.
Market: the homes, industries and services that will buy the power. Electricity is costly to send far, so a market must be within reach of transmission lines.
Transmission line: a high-voltage line that carries electricity from power stations to the places where it is used; some energy is always lost on the way.
Base load: the minimum demand that must be met all day and night. Peak load: the highest demand, in Rwanda usually in the evening when lights and cooking come on together.
Energy security: having enough affordable energy from reliable sources, without depending too much on one supplier or one route.

Worked example 1: why fuel cost decides the choice
Problem. Two illustrative 10 MW plants are each expected to last 25 years. A solar plant costs US$10 million to build, has a capacity factor of 0.18 and needs no fuel. A diesel plant costs US$4 million, has a capacity factor of 0.50 and spends US$200 on fuel for every MWh it generates. Ignoring interest and maintenance, compare their cost per MWh.
Solution. Find the energy produced each year, then share the building cost over the plant's lifetime output.
The diesel plant is cheaper to build but about eight times dearer per MWh, because fuel must be bought for every unit. That is why diesel is kept for emergencies and peaks; REG reports that Rwanda's diesel plants supply only about 1% of its electricity. The solar plant, however, produces only by day, so it needs storage or other plants for the evening peak.
Worked example 2: choosing a site for a small hydropower plant
Problem. Three illustrative sites are studied on a river in Rwanda. Using with and the dry-season flow, rank them and recommend one.
| Site | Head (m) | Dry-season flow (m³ s⁻¹) | Distance to grid (km) | People to resettle |
|---|---|---|---|---|
| A | 60 | 2.0 | 5 | 0 |
| B | 25 | 6.0 | 30 | 400 |
| C | 80 | 1.5 | 45 | 50 |
Solution. , so in kilowatts .
Site B gives the most power, but it needs 30 km of new line and the resettlement of 400 people. Site C gives the same power as A but is 45 km from the grid. Recommendation: site A, because it gives 1.0 MW in the dry season close to the grid and moves nobody. The physical factor (power) is not decisive on its own; economic and social factors change the ranking.
Kenya's geothermal power shows the factors working together. Physically, the Olkaria field lies inside the Rift Valley near Lake Naivasha, where magma heats rocks close to the surface and steam can be tapped from wells about 2–3 km deep. Economically, the steam is free once wells are drilled, so the power is cheap and steady, ideal for base load; Kenya's growing towns and industries are the market. Politically, the government created a public generating company, KenGen, and a Geothermal Development Company to carry the risk of drilling, which private firms avoid. The result: geothermal power supplied 43.2% of Kenya's electricity in 2024 (IEA). The limits are social and environmental: the field lies in and around Hell's Gate National Park, and some Maasai families have been resettled to make way for new plants.

Warning
Common mistake. Answering "factors favouring power production" with physical factors alone. Rwanda has many rivers and steep slopes, yet most of its hydropower potential was unused for decades because capital, a large market and grid lines were missing. Always give examples from at least three groups, and show how they interact.
Tip
Memory hook: "PEPS". Physical, Economic, Political, Social. For each named power station in your notes, write one fact under each letter. That turns a list into a case study.
Al Jazeera English: "Kenya's geothermal energy to lift millions out of poverty", reported by Catherine Soi from the Olkaria plant in the Rift Valley. As you watch, note one physical, one economic and one social factor behind the project.
Practice
Summary
Sources and credits
Photos: Kariba Dam Wall (JonGT, CC BY-SA 4.0) and Olkaria V Geothermal Power Station (Macabe5387, CC BY-SA 4.0), via Wikimedia Commons.
Video: "Kenya's geothermal energy to lift millions out of poverty", Al Jazeera English, embedded from YouTube.
Figure 1, the worked examples and exercises: written by Ganzaa.